<bdo id="hh4b9"><optgroup id="hh4b9"></optgroup></bdo>

    <tbody id="hh4b9"><div id="hh4b9"></div></tbody>
  1. <track id="hh4b9"><span id="hh4b9"><em id="hh4b9"></em></span></track>
    <option id="hh4b9"></option>
      <track id="hh4b9"></track>

    1. <bdo id="hh4b9"></bdo>

      History

      2010-Present

      overlay
      overlay
      2010

      FPL Group changed its name to NextEra Energy, reflecting the company's commitment to the environment and its expansion outside of Florida. The company is listed on the New York Stock Exchange as NEE.

      Martin Next Generation Solar Energy Center

      2011

      The Martin Next Generation Solar Energy Center was brought online. It was the first hybrid solar facility in the world to combine a solar-thermal field with a combined-cycle natural gas power plant.

      overlay

       

      2011

      The company began the first of several modernizations of its 1960s oil- and gas-fired power plants, including Riviera Beach, Cape Canaveral and Port Everglades.

      overlay

       

      2012

      The company celebrated the commissioning of its 10,000th megawatt of wind energy.

      overlay

       

      2013

      NextEra Energy completed the largest multi-state nuclear uprate project in U.S. history. The multi-billion dollar expansion at St. Lucie, Turkey Point and Point Beach involved six separate nuclear units.

      overlay

       

      2013

      The company completed a massive grid modernization project in Florida, including the installation of more than 4.5 million smart meters and deployment of smart grid technology.

      overlay

       

      2014

      The company launched NextEra Energy Partners, a growth-oriented limited partnership to acquire, manage and own contracted clean energy projects with stable, long-term cash flows. At the time, it was the most successful IPO of its kind.

      抹茶在线播放视频